Officiell sammanfattning · English
Vad upphandlas?
The contract work includes maintenance work on national road tunnels in the North, Nordland, Troms and Finnmark counties. The extent of the work is mainly the closure of the recommended measures after the main geological inspection. The measures will mainly include; Rock protection in the form of rock and rock clearing, pigging and securing with shotcrete, as well as mounting bolts, handling any saws. Demolition of old water/frost protection (PE foam) with associated fastening material. Establishment of new water/frost protection and fire protection.
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The contract work includes maintenance work on national road tunnels in the North, Nordland, Troms and Finnmark counties. The extent of the work is mainly the closure of the recommended measures after the main geological inspection. The measures will mainly include; Rock protection in the form of rock and rock clearing, pigging and securing with shotcrete, as well as mounting bolts, handling any saws. Demolition of old water/frost protection (PE foam) with associated fastening material. Establishment of new water/frost protection and fire protection.
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
-
Rättelsemeddelande Aktuellt meddelande
· TED 601205-2026
Ändrade avsnitt: 1 Öppna officiellt meddelande ↗
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 601205-2026. Kontrollerad 4 sep. 2026 06:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.