Rezumat oficial · English
Ce se achiziționează?
The contract work includes maintenance work on national road tunnels in the North, Nordland, Troms and Finnmark counties. The extent of the work is mainly the closure of the recommended measures after the main geological inspection. The measures will mainly include; Rock protection in the form of rock and rock clearing, pigging and securing with shotcrete, as well as mounting bolts, handling any saws. Demolition of old water/frost protection (PE foam) with associated fastening material. Establishment of new water/frost protection and fire protection.
Traducere automată orientativă. Rezumatul oficial rămâne referința.
Rezumat oficial · English
The contract work includes maintenance work on national road tunnels in the North, Nordland, Troms and Finnmark counties. The extent of the work is mainly the closure of the recommended measures after the main geological inspection. The measures will mainly include; Rock protection in the form of rock and rock clearing, pigging and securing with shotcrete, as well as mounting bolts, handling any saws. Demolition of old water/frost protection (PE foam) with associated fastening material. Establishment of new water/frost protection and fire protection.
Istoricul anunțului
Cronologia procedurii de achiziție
Urmăriți principalele etape și actualizări legate de această procedură de achiziție.
-
Anunț de rectificare Anunțul curent
· TED 601205-2026
Secțiuni modificate: 1 Deschideți anunțul oficial ↗
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.
Sursă și fiabilitate
TED · 601205-2026. Verificat la 4 sept. 2026, 06:05.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.