Officiell sammanfattning · English
Vad upphandlas?
The Contracting Entity intends to procure an Employer designed works Contractor for the construction of new electricity transmission infrastructure at the existing Belcamp 220 kV substation. It is envisaged that the scope of works to be procured under this Prequalification Questionnaire (PQQ) will be as outlined in section A.1.1 of the attached document. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attached document. At the date of issuing this PQQ it is envisaged that the works will be constructed over a circa. 12–14 month period.
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The Contracting Entity intends to procure an Employer designed works Contractor for the construction of new electricity transmission infrastructure at the existing Belcamp 220 kV substation. It is envisaged that the scope of works to be procured under this Prequalification Questionnaire (PQQ) will be as outlined in section A.1.1 of the attached document. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attached document. At the date of issuing this PQQ it is envisaged that the works will be constructed over a circa. 12–14 month period.
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 592371-2026. Kontrollerad 28 aug. 2026 09:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.