Ametlik kokkuvõte · English
Mida hangitakse?
The Contracting Entity intends to procure an Employer designed works Contractor for the construction of new electricity transmission infrastructure at the existing Belcamp 220 kV substation. It is envisaged that the scope of works to be procured under this Prequalification Questionnaire (PQQ) will be as outlined in section A.1.1 of the attached document. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attached document. At the date of issuing this PQQ it is envisaged that the works will be constructed over a circa. 12–14 month period.
Abistav masintõlge. Ametlik kokkuvõte jääb määravaks.
Ametlik kokkuvõte · English
The Contracting Entity intends to procure an Employer designed works Contractor for the construction of new electricity transmission infrastructure at the existing Belcamp 220 kV substation. It is envisaged that the scope of works to be procured under this Prequalification Questionnaire (PQQ) will be as outlined in section A.1.1 of the attached document. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attached document. At the date of issuing this PQQ it is envisaged that the works will be constructed over a circa. 12–14 month period.
Tasuta
Saage selle valdkonna järgmised hanked
Saate kord nädalas e-kirja uute teadetega, mis vastavad teie tingimustele. Enne tasuta teavituse aktiveerimist kontrollige või muutke tingimusi.
Teate ajalugu
Hankemenetluse ajajoon
Jälgige selle hankemenetlusega seotud põhietappe ja uuendusi.
Ühtegi muud seotud teadet ei ole veel tuvastatud.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.
Allikas ja usaldusväärsus
TED · 592371-2026. Kontrollitud 28. aug 2026 09:05.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.