Officiell sammanfattning · English
Vad upphandlas?
The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The somatics building has a total area of approx. 130,000 m2 and it is divided into base and high-rise buildings.2441 Steel profile doors and walls consist of the following main services: Profile doors, where the majority of the doors are steel profile doors, whilst the doors at the wind trap are aluminium profile doors, steel profile doors with glass/fixed field on the side and overAluminium ́s profile doors with glass/fixed field on the side and overSkyved doors in steel profile with glass/fixed field on the side and overglass/fixed field without door. Steel and Alumini
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The somatics building has a total area of approx. 130,000 m2 and it is divided into base and high-rise buildings.2441 Steel profile doors and walls consist of the following main services: Profile doors, where the majority of the doors are steel profile doors, whilst the doors at the wind trap are aluminium profile doors, steel profile doors with glass/fixed field on the side and overAluminium ́s profile doors with glass/fixed field on the side and overSkyved doors in steel profile with glass/fixed field on the side and overglass/fixed field without door. Steel and Alumini
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
-
Rättelsemeddelande Aktuellt meddelande
· TED 452940-2026
Ändrade avsnitt: 1 Öppna officiellt meddelande ↗
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 452940-2026. Kontrollerad 23 aug. 2026 11:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.