Sintesi ufficiale · English
Che cosa viene acquistato?
The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The somatics building has a total area of approx. 130,000 m2 and it is divided into base and high-rise buildings.2441 Steel profile doors and walls consist of the following main services: Profile doors, where the majority of the doors are steel profile doors, whilst the doors at the wind trap are aluminium profile doors, steel profile doors with glass/fixed field on the side and overAluminium ́s profile doors with glass/fixed field on the side and overSkyved doors in steel profile with glass/fixed field on the side and overglass/fixed field without door. Steel and Alumini
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
The new Aker Hospital consists of several building complexes, which in turn are divided into several buildings and contracts. This contract applies to the Somatikk building, which is located centrally on the site at Aker. The somatics building has a total area of approx. 130,000 m2 and it is divided into base and high-rise buildings.2441 Steel profile doors and walls consist of the following main services: Profile doors, where the majority of the doors are steel profile doors, whilst the doors at the wind trap are aluminium profile doors, steel profile doors with glass/fixed field on the side and overAluminium ́s profile doors with glass/fixed field on the side and overSkyved doors in steel profile with glass/fixed field on the side and overglass/fixed field without door. Steel and Alumini
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
-
Avviso di rettifica Avviso corrente
· TED 452940-2026
Sezioni modificate: 1 Apri l’avviso ufficiale ↗
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 452940-2026. Verificato il 23 ago 2026, 11:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.