Uradni povzetek · English
Kaj je predmet naročila?
The project involves an upgrade to the public realm along Main Street and Station Road in the village of Adare. The proposed scheme objective is to improve mobility within the village as part of providing a safe and sustainable transport network with enhanced pedestrian accessibility as well as keeping through traffic moving at lower speeds but without causing too much impediment. This will be accomplished by widening footpaths, removal of some on street parking, upgrading facilities for vulnerable road users, providing road crossing facilities and narrowing the main street in Adare to a consistent carriageway width of 6.5 meters.…
Informativni strojni prevod. Uradni povzetek ostaja merodajen.
Uradni povzetek · English
The project involves an upgrade to the public realm along Main Street and Station Road in the village of Adare. The proposed scheme objective is to improve mobility within the village as part of providing a safe and sustainable transport network with enhanced pedestrian accessibility as well as keeping through traffic moving at lower speeds but without causing too much impediment. This will be accomplished by widening footpaths, removal of some on street parking, upgrading facilities for vulnerable road users, providing road crossing facilities and narrowing the main street in Adare to a consistent carriageway width of 6.5 meters.…
Zgodovina obvestil
Časovnica postopka javnega naročanja
Spremljajte glavne faze in posodobitve, povezane s tem postopkom javnega naročanja.
Za zdaj ni bilo najdeno nobeno drugo povezano obvestilo.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.
Vir in zanesljivost
TED · 744222-2026. Preverjeno 29. okt. 2026 14:05.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.