Résumé officiel · English
Quel est l’objet du marché ?
The project involves an upgrade to the public realm along Main Street and Station Road in the village of Adare. The proposed scheme objective is to improve mobility within the village as part of providing a safe and sustainable transport network with enhanced pedestrian accessibility as well as keeping through traffic moving at lower speeds but without causing too much impediment. This will be accomplished by widening footpaths, removal of some on street parking, upgrading facilities for vulnerable road users, providing road crossing facilities and narrowing the main street in Adare to a consistent carriageway width of 6.5 meters.…
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The project involves an upgrade to the public realm along Main Street and Station Road in the village of Adare. The proposed scheme objective is to improve mobility within the village as part of providing a safe and sustainable transport network with enhanced pedestrian accessibility as well as keeping through traffic moving at lower speeds but without causing too much impediment. This will be accomplished by widening footpaths, removal of some on street parking, upgrading facilities for vulnerable road users, providing road crossing facilities and narrowing the main street in Adare to a consistent carriageway width of 6.5 meters.…
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 744222-2026. Vérifié le 29 oct. 2026 à 14:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.