Odprto Vir · Jezik: English

Irska · Gradbena dela

Uradni predmet · English

Mary Immaculate College - Tailteann T2 Building Gym

Mary Immaculate College · Irska

Rok 7. sep. 2026 16:00 UTC
Ocenjena vrednost800 000 EUR
Objavljeno10. avg. 2026
Odpri uradno obvestilo ↗

Uradni povzetek · English

Kaj je predmet naročila?

The full removal of the gym floor back to the original concrete slab, including the existing underfloor heating system, then new build-up of 55mm screed on new DPM. New high impact gym floor will then be done by others. Existing storage room to be converted into an office which involves new suspended ceiling, plasterboard walls, painting and skirting. Existing wall requires breaking through for a new window and door from the cardio area side. The large door to the gym will require removal, disposal and a new door fitted. The cardio area will have the existing two individual plasterboard and metal grid ceilings removed, then a new suspended ceiling fitted across the full room. Electrical works include the relocation of the existing distribution board from the corridor, into the new office a

Vir in zanesljivost

Vir: uradno obvestilo TED 550426-2026, nazadnje preverjeno 21. avg. 2026 20:07. Odločilna ostaja izvirna objava.

Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.