Oscailte Foinse · Teanga: English

Éire · Oibreacha tógála

Aistriúchán ar siúl…

Mary Immaculate College - Tailteann T2 Building Gym

Mary Immaculate College · Éire

Spriocdháta 7 MFómh 2026 16:00 UTC
Luach measta800,000 EUR
Foilsithe10 Lún 2026
Oscail an fógra oifigiúil ↗

Achoimre oifigiúil · English

Cad atá á sholáthar?

The full removal of the gym floor back to the original concrete slab, including the existing underfloor heating system, then new build-up of 55mm screed on new DPM. New high impact gym floor will then be done by others. Existing storage room to be converted into an office which involves new suspended ceiling, plasterboard walls, painting and skirting. Existing wall requires breaking through for a new window and door from the cardio area side. The large door to the gym will require removal, disposal and a new door fitted. The cardio area will have the existing two individual plasterboard and metal grid ceilings removed, then a new suspended ceiling fitted across the full room. Electrical works include the relocation of the existing distribution board from the corridor, into the new office a

Foinse agus iontaofacht

Foinse: fógra oifigiúil TED 550426-2026, seiceáilte go deireanach an 21 Lún 2026 20:07. Is í an bhunfhoilseachán an fhoinse údarásach.

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.