The subject of the public contract is the supply of an electric arc furnace (EAF) of 200 tons capacity with all associated facilities as its steelmaking facilities. The requirement is to have a steelmaking furnace designed for flexibility where the input charge mix shall be flexible allowing a ratio of 100 %, 75 % Scrap + 25 % DRI/HBI OR 50 % Scrap + 50 % DRI/HBI, as per requirement. The requirement further stipulates that there is an external scrap pre-heating facility. Scrap shall be supplied from existing scrap yard through existing rail route (approximately 80-90 %) and by truck (approximately 10 - 20 %). The steel produced will be dispatched to the two existing continuous casting machines (CCM1 or CCM2) OR in future via one new billet CCM (CCM4) instead of CCM1.…
Machinevertaling ter ondersteuning. De officiële samenvatting blijft leidend.
Officiële samenvatting · Čeština
The subject of the public contract is the supply of an electric arc furnace (EAF) of 200 tons capacity with all associated facilities as its steelmaking facilities. The requirement is to have a steelmaking furnace designed for flexibility where the input charge mix shall be flexible allowing a ratio of 100 %, 75 % Scrap + 25 % DRI/HBI OR 50 % Scrap + 50 % DRI/HBI, as per requirement. The requirement further stipulates that there is an external scrap pre-heating facility. Scrap shall be supplied from existing scrap yard through existing rail route (approximately 80-90 %) and by truck (approximately 10 - 20 %). The steel produced will be dispatched to the two existing continuous casting machines (CCM1 or CCM2) OR in future via one new billet CCM (CCM4) instead of CCM1.…
Historie van de aankondiging
Tijdlijn van de aanbestedingsprocedure
Volg de belangrijkste fasen en updates van deze aanbestedingsprocedure.
Er is nog geen andere gerelateerde aankondiging gevonden.
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.
Bron en betrouwbaarheid
TED · 270633-2026. Gecontroleerd op 21 aug. 2026 22:05.
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.