Virallinen yhteenveto · Čeština
Mitä hankitaan?
The subject of the public contract is the supply of an electric arc furnace (EAF) of 200 tons capacity with all associated facilities as its steelmaking facilities. The requirement is to have a steelmaking furnace designed for flexibility where the input charge mix shall be flexible allowing a ratio of 100 %, 75 % Scrap + 25 % DRI/HBI OR 50 % Scrap + 50 % DRI/HBI, as per requirement. The requirement further stipulates that there is an external scrap pre-heating facility. Scrap shall be supplied from existing scrap yard through existing rail route (approximately 80-90 %) and by truck (approximately 10 - 20 %). The steel produced will be dispatched to the two existing continuous casting machines (CCM1 or CCM2) OR in future via one new billet CCM (CCM4) instead of CCM1.…
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · Čeština
The subject of the public contract is the supply of an electric arc furnace (EAF) of 200 tons capacity with all associated facilities as its steelmaking facilities. The requirement is to have a steelmaking furnace designed for flexibility where the input charge mix shall be flexible allowing a ratio of 100 %, 75 % Scrap + 25 % DRI/HBI OR 50 % Scrap + 50 % DRI/HBI, as per requirement. The requirement further stipulates that there is an external scrap pre-heating facility. Scrap shall be supplied from existing scrap yard through existing rail route (approximately 80-90 %) and by truck (approximately 10 - 20 %). The steel produced will be dispatched to the two existing continuous casting machines (CCM1 or CCM2) OR in future via one new billet CCM (CCM4) instead of CCM1.…
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 270633-2026. Tarkistettu 21.8.2026 klo 22.05.