Sommarju uffiċjali · English
X’qed jiġi akkwistat?
The objective of the procurement is to enter into a contract for the procurement and delivery of crushed rock as rock masses from a supplier. NVE has constructed a fangvoll in Olderdalen in Kåfjord municipality. Fangvollen is 205 meters long, with height from 11-14 meters and was completed in 2019. Fangvollen's leside has suffered damage as a result of surface slippage. A slope foot shall be constructed of crushed rock, with a ditch leading away surface water, the foot of the filling functions as an access road throughout the construction period. The need for procurements is estimated: 6,400 tonnes (4,000m³) 0-300 mm crushed rock. 750 tons (500m³) 20-120 mm crushed rock.
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
The objective of the procurement is to enter into a contract for the procurement and delivery of crushed rock as rock masses from a supplier. NVE has constructed a fangvoll in Olderdalen in Kåfjord municipality. Fangvollen is 205 meters long, with height from 11-14 meters and was completed in 2019. Fangvollen's leside has suffered damage as a result of surface slippage. A slope foot shall be constructed of crushed rock, with a ditch leading away surface water, the foot of the filling functions as an access road throughout the construction period. The need for procurements is estimated: 6,400 tonnes (4,000m³) 0-300 mm crushed rock. 750 tons (500m³) 20-120 mm crushed rock.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 546338-2026. Iċċekkjat fil-24 Aww 2026 14:06.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.