Što se nabavlja?
The objective of the procurement is to enter into a contract for the procurement and delivery of crushed rock as rock masses from a supplier. NVE has constructed a fangvoll in Olderdalen in Kåfjord municipality. Fangvollen is 205 meters long, with height from 11-14 meters and was completed in 2019. Fangvollen's leside has suffered damage as a result of surface slippage. A slope foot shall be constructed of crushed rock, with a ditch leading away surface water, the foot of the filling functions as an access road throughout the construction period. The need for procurements is estimated: 6,400 tonnes (4,000m³) 0-300 mm crushed rock. 750 tons (500m³) 20-120 mm crushed rock.
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
The objective of the procurement is to enter into a contract for the procurement and delivery of crushed rock as rock masses from a supplier. NVE has constructed a fangvoll in Olderdalen in Kåfjord municipality. Fangvollen is 205 meters long, with height from 11-14 meters and was completed in 2019. Fangvollen's leside has suffered damage as a result of surface slippage. A slope foot shall be constructed of crushed rock, with a ditch leading away surface water, the foot of the filling functions as an access road throughout the construction period. The need for procurements is estimated: 6,400 tonnes (4,000m³) 0-300 mm crushed rock. 750 tons (500m³) 20-120 mm crushed rock.
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 546338-2026. Provjereno 24. kol 2026. 14:06.