Sommarju uffiċjali · English
X’qed jiġi akkwistat?
Mary Immaculate College proposes to replace the existing Áras na Phiarsaigh Library with a new build Library and Learning Resource Centre adjacent to the current library. Once completed, most of the existing library will be demolished and a plaza will be developed between the Tara Building, the Quadrangle, and the New Library and Learning Resource Centre. The project will also include the refurbishment of an existing 300 seat lecture theatre annexed to the existing library, which is connected to the Tara Building. Mary Immaculate College wish to procure a Main Contractor for undertaking the Library and Learning Resource Centre project, on their Limerick College campus.
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
Mary Immaculate College proposes to replace the existing Áras na Phiarsaigh Library with a new build Library and Learning Resource Centre adjacent to the current library. Once completed, most of the existing library will be demolished and a plaza will be developed between the Tara Building, the Quadrangle, and the New Library and Learning Resource Centre. The project will also include the refurbishment of an existing 300 seat lecture theatre annexed to the existing library, which is connected to the Tara Building. Mary Immaculate College wish to procure a Main Contractor for undertaking the Library and Learning Resource Centre project, on their Limerick College campus.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 310218-2026. Iċċekkjat fil-22 Aww 2026 03:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.