Sintesi ufficiale · English
Che cosa viene acquistato?
Mary Immaculate College proposes to replace the existing Áras na Phiarsaigh Library with a new build Library and Learning Resource Centre adjacent to the current library. Once completed, most of the existing library will be demolished and a plaza will be developed between the Tara Building, the Quadrangle, and the New Library and Learning Resource Centre. The project will also include the refurbishment of an existing 300 seat lecture theatre annexed to the existing library, which is connected to the Tara Building. Mary Immaculate College wish to procure a Main Contractor for undertaking the Library and Learning Resource Centre project, on their Limerick College campus.
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
Mary Immaculate College proposes to replace the existing Áras na Phiarsaigh Library with a new build Library and Learning Resource Centre adjacent to the current library. Once completed, most of the existing library will be demolished and a plaza will be developed between the Tara Building, the Quadrangle, and the New Library and Learning Resource Centre. The project will also include the refurbishment of an existing 300 seat lecture theatre annexed to the existing library, which is connected to the Tara Building. Mary Immaculate College wish to procure a Main Contractor for undertaking the Library and Learning Resource Centre project, on their Limerick College campus.
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 310218-2026. Verificato il 22 ago 2026, 03:05.