Aperto Fonte · Lingua: English

Irlanda · Lavori di costruzione

Oggetto ufficiale · English

EST_MW_UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick

Health Service Executive (HSE) · Irlanda

Scadenza 11 set 2026, 13:00 UTC
Valore stimato91.288.760 EUR
Pubblicato10 ago 2026
Apri l’avviso ufficiale ↗

Sintesi ufficiale · English

Che cosa viene acquistato?

The project comprises the vertical expansion of an existing 24-bed ward (Block G) building, which was constructed under emergency legislation during the COVID-19 pandemic and is located on the University Hospital Limerick campus, which is an acute hospital. The vertical expansion will provide 72 additional beds across three new ward levels, together with staff and ancillary accommodation, plant room at the fourth floor and part of the fifth floor, and additional vertical circulation, including 2 new stair cores and lifts with an overall floor area of circa 6,617 m2 inclusive of the plantroom area and all ancillary site development above and below ground. The works will take place within an operational campus adjacent to live 24/7 clinical departments.

Fonte e affidabilità

Fonte: avviso TED ufficiale 551585-2026, verificato l’ultima volta il 21 ago 2026, 20:07. La pubblicazione originale resta il riferimento.

I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.