Ouvert Source · Langue: English

Irlande · Travaux de construction

Objet officiel · English

EST_MW_UHL Block G – 72 Inpatient Bed Ward Expansion at University Hospital Limerick

Health Service Executive (HSE) · Irlande

Échéance 11 sept. 2026 à 13:00 UTC
Valeur estimée91 288 760 EUR
Publié10 août 2026
Ouvrir l’avis officiel ↗

Résumé officiel · English

Quel est l’objet du marché ?

The project comprises the vertical expansion of an existing 24-bed ward (Block G) building, which was constructed under emergency legislation during the COVID-19 pandemic and is located on the University Hospital Limerick campus, which is an acute hospital. The vertical expansion will provide 72 additional beds across three new ward levels, together with staff and ancillary accommodation, plant room at the fourth floor and part of the fifth floor, and additional vertical circulation, including 2 new stair cores and lifts with an overall floor area of circa 6,617 m2 inclusive of the plantroom area and all ancillary site development above and below ground. The works will take place within an operational campus adjacent to live 24/7 clinical departments.

Source et fiabilité

Source : avis TED officiel 551585-2026, vérifié pour la dernière fois le 21 août 2026 à 20:07. La publication d’origine reste la référence.

Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.