Sintesi ufficiale · English
Che cosa viene acquistato?
Enterprise Ireland proposes to establish a Single Party Framework Agreement for the provision of Outsourced Integrated Facility Management Services. The framework will include both scheduled services and call out cover in the event of system failures/urgent requirements. Critical events or equipment failure will demand a maximum 4 -hour response time. It will be an essential requirement of the framework that the appointed framework operator will provide call out cover and repairs within a 24-hour period in the event of a fault. The framework operator will fully comply with all statutory requirements (including but not limited to Health and Safety regulations) in the delivery of the services required under the framework (e.g. equipment maintenance). These requirements will be set out in the
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
Enterprise Ireland proposes to establish a Single Party Framework Agreement for the provision of Outsourced Integrated Facility Management Services. The framework will include both scheduled services and call out cover in the event of system failures/urgent requirements. Critical events or equipment failure will demand a maximum 4 -hour response time. It will be an essential requirement of the framework that the appointed framework operator will provide call out cover and repairs within a 24-hour period in the event of a fault. The framework operator will fully comply with all statutory requirements (including but not limited to Health and Safety regulations) in the delivery of the services required under the framework (e.g. equipment maintenance). These requirements will be set out in the
Gratuito
Ricevi le prossime gare di questo settore
Ricevi ogni settimana un’e-mail con i nuovi avvisi che corrispondono ai tuoi criteri. Verifica o modifica i criteri prima di attivare l’avviso gratuito.
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 513943-2026. Verificato il 23 ago 2026, 22:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.