Virallinen yhteenveto · English
Mitä hankitaan?
Enterprise Ireland proposes to establish a Single Party Framework Agreement for the provision of Outsourced Integrated Facility Management Services. The framework will include both scheduled services and call out cover in the event of system failures/urgent requirements. Critical events or equipment failure will demand a maximum 4 -hour response time. It will be an essential requirement of the framework that the appointed framework operator will provide call out cover and repairs within a 24-hour period in the event of a fault. The framework operator will fully comply with all statutory requirements (including but not limited to Health and Safety regulations) in the delivery of the services required under the framework (e.g. equipment maintenance). These requirements will be set out in the
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · English
Enterprise Ireland proposes to establish a Single Party Framework Agreement for the provision of Outsourced Integrated Facility Management Services. The framework will include both scheduled services and call out cover in the event of system failures/urgent requirements. Critical events or equipment failure will demand a maximum 4 -hour response time. It will be an essential requirement of the framework that the appointed framework operator will provide call out cover and repairs within a 24-hour period in the event of a fault. The framework operator will fully comply with all statutory requirements (including but not limited to Health and Safety regulations) in the delivery of the services required under the framework (e.g. equipment maintenance). These requirements will be set out in the
Ilmainen
Saa tämän alan seuraavat tarjouskilpailut
Saat viikoittain sähköpostin uusista hakuehtojasi vastaavista ilmoituksista. Tarkista tai muokkaa ehtoja ennen maksuttoman ilmoitusvahdin käyttöönottoa.
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 513943-2026. Tarkistettu 23.8.2026 klo 22.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.