Sintesi ufficiale · English
Che cosa viene acquistato?
The objective of this tender is to sign a contract with one contractor to perform cost effectiveness studies and business case analyses for future Offshore Wind Farm sites in the Netherlands. Skills in strategic zoning, energy yield analysis, and cost modelling are essential to support informed financial and planning decisions. The services under this contract will consist of, but not be limited to: • Conduct studies that provide insights into key economic and technical performance indicators of wind farms, such as Levelized Cost of Energy (LCOE) analyses • Determine the absolute values of the main drivers, specifically the financial components of the wind farm (CAPEX and OPEX) and annual energy production (AEP) • Design and optimization of Offshore Wind Farm layouts and zoning, • Conduct
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
The objective of this tender is to sign a contract with one contractor to perform cost effectiveness studies and business case analyses for future Offshore Wind Farm sites in the Netherlands. Skills in strategic zoning, energy yield analysis, and cost modelling are essential to support informed financial and planning decisions. The services under this contract will consist of, but not be limited to: • Conduct studies that provide insights into key economic and technical performance indicators of wind farms, such as Levelized Cost of Energy (LCOE) analyses • Determine the absolute values of the main drivers, specifically the financial components of the wind farm (CAPEX and OPEX) and annual energy production (AEP) • Design and optimization of Offshore Wind Farm layouts and zoning, • Conduct
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 358543-2026. Verificato il 22 ago 2026, 13:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.