Résumé officiel · English
Quel est l’objet du marché ?
The objective of this tender is to sign a contract with one contractor to perform cost effectiveness studies and business case analyses for future Offshore Wind Farm sites in the Netherlands. Skills in strategic zoning, energy yield analysis, and cost modelling are essential to support informed financial and planning decisions. The services under this contract will consist of, but not be limited to: • Conduct studies that provide insights into key economic and technical performance indicators of wind farms, such as Levelized Cost of Energy (LCOE) analyses • Determine the absolute values of the main drivers, specifically the financial components of the wind farm (CAPEX and OPEX) and annual energy production (AEP) • Design and optimization of Offshore Wind Farm layouts and zoning, • Conduct
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The objective of this tender is to sign a contract with one contractor to perform cost effectiveness studies and business case analyses for future Offshore Wind Farm sites in the Netherlands. Skills in strategic zoning, energy yield analysis, and cost modelling are essential to support informed financial and planning decisions. The services under this contract will consist of, but not be limited to: • Conduct studies that provide insights into key economic and technical performance indicators of wind farms, such as Levelized Cost of Energy (LCOE) analyses • Determine the absolute values of the main drivers, specifically the financial components of the wind farm (CAPEX and OPEX) and annual energy production (AEP) • Design and optimization of Offshore Wind Farm layouts and zoning, • Conduct
Gratuit
Recevez les prochains marchés de cette activité
Retrouvez les nouveaux avis correspondant à vos critères dans un e-mail hebdomadaire. Vérifiez ou ajustez les critères avant d’activer votre alerte gratuite.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 358543-2026. Vérifié le 22 août 2026 à 13:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.