Hivatalos összefoglaló · English
Mi a beszerzés tárgya?
Supply of new low-floor electric buses, including battery charging infrastructure (night charging stations and fast charging stations at final stops), main spare parts, wearing and consumable spare parts, maintenance and repair equipment and tools, and related services up to a total budget of € 9.840 million, sales taxes and customs duties excluded, including: - Supply of E-Buses low-floor, length of 12,5metres long (±0,5m); - Supply of Battery charging infrastructure; - Delivery of Documentation as specified in sub-clause 16.10 of Technical Specification of Section VI, Supply Requirements; - Supply of E-Bus maintenance and repairs equipment and tools; - Supply of Main spare parts, Consumable and wearable spare parts; - Supply of related services (commissioning and training); - Incoterm De
Forrás és megbízhatóság
Forrás: hivatalos TED-hirdetmény, 556241-2026. Utoljára ellenőrizve: 2026. aug. 21. 20:07. Az eredeti közzététel marad az irányadó.
Az adatokat a könnyebb olvashatóság érdekében átrendezzük. Mindig a hivatalos hirdetmény és a közbeszerzési dokumentumok az irányadók.