Achoimre ar an deis
Cad atá á sholáthar?
Supply of new low-floor electric buses, including battery charging infrastructure (night charging stations and fast charging stations at final stops), main spare parts, wearing and consumable spare parts, maintenance and repair equipment and tools, and related services up to a total budget of € 9.840 million, sales taxes and customs duties excluded, including: - Supply of E-Buses low-floor, length of 12,5metres long (±0,5m); - Supply of Battery charging infrastructure; - Delivery of Documentation as specified in sub-clause 16.10 of Technical Specification of Section VI, Supply Requirements; - Supply of E-Bus maintenance and repairs equipment and tools; - Supply of Main spare parts, Consumable and wearable spare parts; - Supply of related services (commissioning and training); - Incoterm De
Foinse agus iontaofacht
Foinse: fógra oifigiúil TED 556241-2026, seiceáilte go deireanach an 21 Lún 2026 20:07. Is í an bhunfhoilseachán an fhoinse údarásach.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.