Ag dúnadh go luath Foinse · Teanga: English

Éire · Oibreacha tógála

Ábhar oifigiúil English

Contractor for Additional Accommodation Reconfiguration and In-Fill Works to provide 1x Art Room, 1x Woodwork room and preparation area to Presentation Secondary School, Ballyphehane, Cork.

Aistrítear an tír agus an earnáil; fanann an t-ábhar sa teanga fhoinseach.

Presentation Secondary School (Ballyphehane) · Éire

Spriocdháta 24 Lún 2026 11:00 UTC
Luach measta500,000 EUR
Foilsithe3 Lún 2026
Oscail an fógra oifigiúil ↗

Achoimre ar an deis

Cad atá á sholáthar?

The proposed development consists of Reconfiguration Works to provide •1 No. Conversion of Existing Home Economics Room in to Art Room (96.5m²), •1 No. Conversion of Existing Art Room in to Wood Technology Room (99.5m²), •In-Fill construction providing a Wood Machining and Preparation Room of 30m² area. The proposed reconfiguration layouts make the maximum use of the existing available space within the existing classrooms and the additional in-fill Wood Machining and Preparation Room slots within the existing footprint of the building.

Foinse agus iontaofacht

Foinse: fógra oifigiúil TED 534094-2026, seiceáilte go deireanach an 21 Lún 2026 20:05. Is í an bhunfhoilseachán an fhoinse údarásach.

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.