Oscailte Foinse · Teanga: English

an Iorua · Innealra tionsclaíoch

Ábhar oifigiúil · English

Purchase of treatment plant for BIR Ressurs - Mjelstad landfill

BIR AS · an Iorua

Spriocdháta 4 MFómh 2026 10:00 UTC
Luach measta12,000,000 NOK
Foilsithe18 Meith 2026
Oscail an fógra oifigiúil ↗

Achoimre oifigiúil · English

Cad atá á sholáthar?

BIR Resource Dep. Mjelstad (referred to as BIR) shall, in connection with the expansion of the landfill site, procure a new treatment facility forige water that occurs as a result of precipitation hitting and going through the landfill. BIR shall ensure that the area and building is established where the treatment plant shall be constructed. Tenderers of the treatment plant must be responsible for the complete delivery of treatment facilities with all the accompanying equipment that is necessary for operation, as well as assembly, commissioning and training. This is further described in the tender documentation. It is important for BIR to get sufficient information about the treatment facility to facilitate with the correct dimensioned building. BIR shall procure the pumps that shall deliv

Foinse agus iontaofacht

Foinse: fógra oifigiúil TED 419702-2026, seiceáilte go deireanach an 23 Lún 2026 04:05. Is í an bhunfhoilseachán an fhoinse údarásach.

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.