Résumé officiel · English
Quel est l’objet du marché ?
Award of Works Contract and PCSC for the New Library and Parnell Square Cultural Quarter Project – Phase 1, Parnell Square North, Dublin 11. 1. The construction of a new 5-storey building over basement of approximately 6,100m2 (excluding roof plant space) located at the rear of Georgian Houses nos. 23-28. The construction of the library includes connections to the Georgian House no. 26 and to Hugh Lane Gallery. 2. The Georgian Terrace works consists of renovation/essential works of Georgian House nos. 23-28, measuring approximately 700m2. This includes the partial refurbishment of no. 25 and 27 and full refurbishment of no. 26, which includes new staff offices, meeting rooms and a new cafe structure to the roof. 3.…
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
Award of Works Contract and PCSC for the New Library and Parnell Square Cultural Quarter Project – Phase 1, Parnell Square North, Dublin 11. 1. The construction of a new 5-storey building over basement of approximately 6,100m2 (excluding roof plant space) located at the rear of Georgian Houses nos. 23-28. The construction of the library includes connections to the Georgian House no. 26 and to Hugh Lane Gallery. 2. The Georgian Terrace works consists of renovation/essential works of Georgian House nos. 23-28, measuring approximately 700m2. This includes the partial refurbishment of no. 25 and 27 and full refurbishment of no. 26, which includes new staff offices, meeting rooms and a new cafe structure to the roof. 3.…
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 720738-2026. Vérifié le 19 oct. 2026 à 11:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.