Virallinen yhteenveto · English
Mitä hankitaan?
DSB is experiencing significant growth in passenger numbers, particularly in the regional and long-distance segments. To address this increased demand before the full integration of new rolling stock from ongoing procurements, DSB foresees a temporary need to supplement its existing fleet of locomotives in commercial operations from approximately December 2026 until the Q2 2030 as outlined in the tender material (Appendix 1 – Price Sheet). DSB therefore plans to lease electric locomotives to support operations with DSB litra EC and other coach litras over three phases: ramp-up, peak, and ramp-down. In the ramp-up phase, from approximately December 2026 to November 2027, it is expected that 6 locomotives will be needed.…
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · English
DSB is experiencing significant growth in passenger numbers, particularly in the regional and long-distance segments. To address this increased demand before the full integration of new rolling stock from ongoing procurements, DSB foresees a temporary need to supplement its existing fleet of locomotives in commercial operations from approximately December 2026 until the Q2 2030 as outlined in the tender material (Appendix 1 – Price Sheet). DSB therefore plans to lease electric locomotives to support operations with DSB litra EC and other coach litras over three phases: ramp-up, peak, and ramp-down. In the ramp-up phase, from approximately December 2026 to November 2027, it is expected that 6 locomotives will be needed.…
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 742493-2026. Tarkistettu 29.10.2026 klo 13.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.