Официално резюме · English
Какво се възлага?
DSB is experiencing significant growth in passenger numbers, particularly in the regional and long-distance segments. To address this increased demand before the full integration of new rolling stock from ongoing procurements, DSB foresees a temporary need to supplement its existing fleet of locomotives in commercial operations from approximately December 2026 until the Q2 2030 as outlined in the tender material (Appendix 1 – Price Sheet). DSB therefore plans to lease electric locomotives to support operations with DSB litra EC and other coach litras over three phases: ramp-up, peak, and ramp-down. In the ramp-up phase, from approximately December 2026 to November 2027, it is expected that 6 locomotives will be needed.…
Машинен превод за ориентация. Официалното резюме остава меродавно.
Официално резюме · English
DSB is experiencing significant growth in passenger numbers, particularly in the regional and long-distance segments. To address this increased demand before the full integration of new rolling stock from ongoing procurements, DSB foresees a temporary need to supplement its existing fleet of locomotives in commercial operations from approximately December 2026 until the Q2 2030 as outlined in the tender material (Appendix 1 – Price Sheet). DSB therefore plans to lease electric locomotives to support operations with DSB litra EC and other coach litras over three phases: ramp-up, peak, and ramp-down. In the ramp-up phase, from approximately December 2026 to November 2027, it is expected that 6 locomotives will be needed.…
История на обявлението
Хронология на процедурата за възлагане
Проследете основните етапи и актуализации, свързани с тази процедура за възлагане.
Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.
Източник и надеждност
TED · 742493-2026. Проверено на 29.10.2026 г., 13:05 ч..
Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.