Virallinen yhteenveto · English
Mitä hankitaan?
The aim of the assignment is to gain more knowledge and insight into what drives the construction cost development in the housing sector over time. Existing sources provide some knowledge, but provide limited insight into cause or drivers. There is a particular need to map how much of the increase in construction costs can be attributed to public requirements and how much is attributable to other market conditions. There is also a need for knowledge on which requirements are of great importance for the construction costs and which are of less importance. Note delivery deadline with analyses and results for part 1 of the assignment and a status report with provisional findings and a plan for further procedure for part 2 is 15.09.2026.…
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · English
The aim of the assignment is to gain more knowledge and insight into what drives the construction cost development in the housing sector over time. Existing sources provide some knowledge, but provide limited insight into cause or drivers. There is a particular need to map how much of the increase in construction costs can be attributed to public requirements and how much is attributable to other market conditions. There is also a need for knowledge on which requirements are of great importance for the construction costs and which are of less importance. Note delivery deadline with analyses and results for part 1 of the assignment and a status report with provisional findings and a plan for further procedure for part 2 is 15.09.2026.…
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 393987-2026. Tarkistettu 22.8.2026 klo 20.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.