Resumen oficial · English
¿Qué se contrata?
The Customers’ smart meters, supplied by Ningbo Sanxing Smart Electric Co.,Ltd. and EMH metering GmbH & Co. KG, cover categories 1–5 and include advanced features beyond the new functionality requirements introduced 2025 January 1st (accordingly to Swedish legislation (SFS 1999:716)), such as extensive power quality measurements (up to 80 series per device). Collection is primarily done by push technology via mobile networks. The number of meters total around 46,000 with the main bulk being Sanxing models and the total number of measurement series collected is around 2,3 million. Due to the expiration of the current Head-End System (HES) supplier agreement, a new procurement of HES is required.…
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The Customers’ smart meters, supplied by Ningbo Sanxing Smart Electric Co.,Ltd. and EMH metering GmbH & Co. KG, cover categories 1–5 and include advanced features beyond the new functionality requirements introduced 2025 January 1st (accordingly to Swedish legislation (SFS 1999:716)), such as extensive power quality measurements (up to 80 series per device). Collection is primarily done by push technology via mobile networks. The number of meters total around 46,000 with the main bulk being Sanxing models and the total number of measurement series collected is around 2,3 million. Due to the expiration of the current Head-End System (HES) supplier agreement, a new procurement of HES is required.…
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 747397-2026. Verificado el 29 oct. 2026 14:06.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.