Resumen oficial · English
¿Qué se contrata?
MULTI-PARTY FRAMEWORK AGREEMENT FOR HSE DESIGN TEAM SERVICES FRAMEWORK 2024 – FRAMEWORK 02: ACUTE HEALTHCARE CAPITAL WORKS – PROJECT VALUE €1M - €15M EXCL. VAT. This framework will include the following design team disciplines (Lots): Lot 1: Architect (AR) as Principal Service Provider with the following Specialists domestic subconsultants, or in-house specialisms: a. Planner (PL), b. Project Supervisor Design Process (PSDP), c. Fire Safety Consultant (FSC) and d. BIM Information Manager (BIM). Lot 2: Quantity Surveyor (QS), as Principal Service Provider. Lot 3: Building Services Engineer (M+E), as Principal Service Provider. Lot 4: Civil / Structural Engineer (C+S), as Principal Service Provider. Lot 5: Employer’s Representative (ER), as Principal Service Provider. Lot 6: Energy Efficient
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
MULTI-PARTY FRAMEWORK AGREEMENT FOR HSE DESIGN TEAM SERVICES FRAMEWORK 2024 – FRAMEWORK 02: ACUTE HEALTHCARE CAPITAL WORKS – PROJECT VALUE €1M - €15M EXCL. VAT. This framework will include the following design team disciplines (Lots): Lot 1: Architect (AR) as Principal Service Provider with the following Specialists domestic subconsultants, or in-house specialisms: a. Planner (PL), b. Project Supervisor Design Process (PSDP), c. Fire Safety Consultant (FSC) and d. BIM Information Manager (BIM). Lot 2: Quantity Surveyor (QS), as Principal Service Provider. Lot 3: Building Services Engineer (M+E), as Principal Service Provider. Lot 4: Civil / Structural Engineer (C+S), as Principal Service Provider. Lot 5: Employer’s Representative (ER), as Principal Service Provider. Lot 6: Energy Efficient
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 631844-2026. Verificado el 14 sept. 2026 11:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.