Resumen oficial · English
¿Qué se contrata?
Donegal County Council wishes to appoint an Engineering Services Provider (ESP) using the standard conditions of engagement COE1 for the design of interconnector watermains for three lots comprising 16 private Group Water Schemes (GWS)s to the closest point on the Public Water Supply. These GWS are located across the county. The service is to include for all Civil and Hydraulic Design services as required; any environmental / ecological evaluations required; preparation of construction tender docs, administration of tender process (publication, clarifications, evaluation, etc.); award and management of construction contract. The ESP will also be required to act as PSDP for the Project.
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
Donegal County Council wishes to appoint an Engineering Services Provider (ESP) using the standard conditions of engagement COE1 for the design of interconnector watermains for three lots comprising 16 private Group Water Schemes (GWS)s to the closest point on the Public Water Supply. These GWS are located across the county. The service is to include for all Civil and Hydraulic Design services as required; any environmental / ecological evaluations required; preparation of construction tender docs, administration of tender process (publication, clarifications, evaluation, etc.); award and management of construction contract. The ESP will also be required to act as PSDP for the Project.
Gratis
Reciba las próximas licitaciones de este sector
Reciba nuevos anuncios que coincidan con sus criterios en un correo semanal. Revise o ajuste los criterios antes de activar su alerta gratuita.
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 583654-2026. Verificado el 27 ago. 2026 11:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.