Resumen oficial · English
¿Qué se contrata?
South East Technological University invites suitably qualified Consultant Teams to tender for Architect Led Integrated Design Team (IDT) and Project Manager Led Project Controls Team (PCT) Services (including other services) associated with the development of new Pharmacy and Veterinary Medicine buildings. The project will be tendered in two separate lots. The project includes the development of two buildings at two separate locations. The first is a combined Pharmacy and Veterinary Medicine academic building totaling circa 2,000M², and is located on the former Waterford Crystal site on the Cork Road, Waterford. The second buildings is a circa 1,000M² Anatomy and Pathology facility located at Teagasc's Kildalton Campus in Piltown, Co Kilkenny. On foot of this procurement procedure South Ea
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
South East Technological University invites suitably qualified Consultant Teams to tender for Architect Led Integrated Design Team (IDT) and Project Manager Led Project Controls Team (PCT) Services (including other services) associated with the development of new Pharmacy and Veterinary Medicine buildings. The project will be tendered in two separate lots. The project includes the development of two buildings at two separate locations. The first is a combined Pharmacy and Veterinary Medicine academic building totaling circa 2,000M², and is located on the former Waterford Crystal site on the Cork Road, Waterford. The second buildings is a circa 1,000M² Anatomy and Pathology facility located at Teagasc's Kildalton Campus in Piltown, Co Kilkenny. On foot of this procurement procedure South Ea
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 528355-2026. Verificado el 24 ago. 2026 8:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.