Resumen oficial · English
¿Qué se contrata?
The main elements of the assignment are engineering design, delivery, assembly, testing and commissioning of 6 new DRUPS installations with the accompanying auxiliary installations that shall be installed as a part of the emergency power system AK1 and AK2. The aim is to use innovative systems without this affecting the quality and robustness of the system. The facility shall be prepared for, and equipped with, technology and infrastructure that increases the building's future value for users, owners and communities.
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The main elements of the assignment are engineering design, delivery, assembly, testing and commissioning of 6 new DRUPS installations with the accompanying auxiliary installations that shall be installed as a part of the emergency power system AK1 and AK2. The aim is to use innovative systems without this affecting the quality and robustness of the system. The facility shall be prepared for, and equipped with, technology and infrastructure that increases the building's future value for users, owners and communities.
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 518200-2026. Verificado el 24 ago. 2026 4:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.