Resumen oficial · English
¿Qué se contrata?
This agreement shall primarily cover the need for cleaning and emptying oil separators/fat separators/drinking water tanks/environmental tanks/mobile toilets, control of blocked tanks/oil separators/environment tanks, improvement of separators/environmental tanks/GUP tanks, replacement of wearing parts/components, as well as leakage searches/camera transport. The contract is for iron-out assignments, as well as minor excavation work on water and sewage pipelines, pipe renewal (noDig)/flow of pipes etc.
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
This agreement shall primarily cover the need for cleaning and emptying oil separators/fat separators/drinking water tanks/environmental tanks/mobile toilets, control of blocked tanks/oil separators/environment tanks, improvement of separators/environmental tanks/GUP tanks, replacement of wearing parts/components, as well as leakage searches/camera transport. The contract is for iron-out assignments, as well as minor excavation work on water and sewage pipelines, pipe renewal (noDig)/flow of pipes etc.
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 487991-2026. Verificado el 23 ago. 2026 17:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.