Resumen oficial · English
¿Qué se contrata?
4-6 parallel framework agreements shall be signed for the hire of project resources. The project resources shall function as construction managers, control engineers and project engineers. The framework agreement will be signed for 2 years with a total of 6 options for 1 year. The maximum length is 8 years. The maximum value of all call-offs during the framework agreement period (up to 8 years) is NOK 800,000,000. Excluding VAT.
Fuente y fiabilidad
Fuente: anuncio oficial de TED 470797-2026, comprobado por última vez el 20 ago. 2026 23:05. La publicación original sigue siendo la referencia.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.