Resumen oficial · English
¿Qué se contrata?
The proposed Works involve stripping of the existing canal bank for the length of the proposed jetties, driving timber piles into the canal edge and bank, construction of timber jetties including bank supports and bracing, installation of service bollards with associated utility works, construction of connecting access pathways and landscaping.
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The proposed Works involve stripping of the existing canal bank for the length of the proposed jetties, driving timber piles into the canal edge and bank, construction of timber jetties including bank supports and bracing, installation of service bollards with associated utility works, construction of connecting access pathways and landscaping.
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 386116-2026. Verificado el 22 ago. 2026 18:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.