Resumen oficial · English
¿Qué se contrata?
The procurement is for construction work in connection with the laying of water pipelines on land in stretch E6 to the water treatment facility (VBA), for Gjøvik municipality. The contract also includes the establishment of a temporary roundabout in Skumsrudvegen, establishment of site roads, excavation on land, work on cultivated land such as laying of water and sewage pipelines, reinventing matter and separation of rock from masses, drilling under Skumsrudvegen, pipe sheet for water and sewage routes skumsrudvegen-VBA, reception and laying of PE pipes and pipe parts, refill works, adjustments etc. Hammer drilling shall be carried out for 3 DN813, 1 DN457 pipe pipe under Skumsrudvegen, and pulling in water and sewage pipelines for a pipe under Skumsrudvegen. In addition this contract incl
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The procurement is for construction work in connection with the laying of water pipelines on land in stretch E6 to the water treatment facility (VBA), for Gjøvik municipality. The contract also includes the establishment of a temporary roundabout in Skumsrudvegen, establishment of site roads, excavation on land, work on cultivated land such as laying of water and sewage pipelines, reinventing matter and separation of rock from masses, drilling under Skumsrudvegen, pipe sheet for water and sewage routes skumsrudvegen-VBA, reception and laying of PE pipes and pipe parts, refill works, adjustments etc. Hammer drilling shall be carried out for 3 DN813, 1 DN457 pipe pipe under Skumsrudvegen, and pulling in water and sewage pipelines for a pipe under Skumsrudvegen. In addition this contract incl
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 340335-2026. Verificado el 22 ago. 2026 9:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.