Resumen oficial · English
¿Qué se contrata?
The objective of the procurement is to enter into a contract for the procurement and delivery of crushed rock as rock masses from a supplier. NVE has constructed a fangvoll in Olderdalen in Kåfjord municipality. Fangvollen is 205 meters long, with height from 11-14 meters and was completed in 2019. Fangvollen's leside has suffered damage as a result of surface slippage. A slope foot shall be constructed of crushed rock, with a ditch leading away surface water, the foot of the filling functions as an access road throughout the construction period. The need for procurements is estimated: 6,400 tonnes (4,000m³) 0-300 mm crushed rock. 750 tons (500m³) 20-120 mm crushed rock.
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The objective of the procurement is to enter into a contract for the procurement and delivery of crushed rock as rock masses from a supplier. NVE has constructed a fangvoll in Olderdalen in Kåfjord municipality. Fangvollen is 205 meters long, with height from 11-14 meters and was completed in 2019. Fangvollen's leside has suffered damage as a result of surface slippage. A slope foot shall be constructed of crushed rock, with a ditch leading away surface water, the foot of the filling functions as an access road throughout the construction period. The need for procurements is estimated: 6,400 tonnes (4,000m³) 0-300 mm crushed rock. 750 tons (500m³) 20-120 mm crushed rock.
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 324804-2026. Verificado el 22 ago. 2026 6:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.