¿Qué se contrata?
The procurement is for construction works for laying water pipelines in Mjøsa, for Gjøvik municipality. The contract also includes excavation on land, drilling on land against the sea, receiving and laying of PE pipes and pipe parts, delivery and assembly of load scales, refilling work, adjustments etc. PE pipelines are to be delivered to the rigging site by the contracting authority by the pipe supplier. The rigging site will be selected by the tenderer. The delivery date must be adapted to the tenderer ́s progress, in the relevant time period. A binding delivery plan will be prepared in consultation with the pipe supplier and tenderer. Pipes are to be delivered and stored for 18 or 20 metres. The executing contractor on site shall be responsible for the development of rigging places and
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The procurement is for construction works for laying water pipelines in Mjøsa, for Gjøvik municipality. The contract also includes excavation on land, drilling on land against the sea, receiving and laying of PE pipes and pipe parts, delivery and assembly of load scales, refilling work, adjustments etc. PE pipelines are to be delivered to the rigging site by the contracting authority by the pipe supplier. The rigging site will be selected by the tenderer. The delivery date must be adapted to the tenderer ́s progress, in the relevant time period. A binding delivery plan will be prepared in consultation with the pipe supplier and tenderer. Pipes are to be delivered and stored for 18 or 20 metres. The executing contractor on site shall be responsible for the development of rigging places and
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 302845-2026. Verificado el 22 ago. 2026 2:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.