The construction project concerns the refurbishment of the building envelope at Hovedstadens Beredskab Teknik and will be carried out in five phases. Phases 1–3 (fixed works): Replacement of the roof covering, installation of internal insulation and external condensation insulation. Replacement of ridge lights. Refurbishment and partial replacement of facade windows. Minor brickwork repairs. Installation of photovoltaic panels. Phase 4 (option): Replacement of the roof, including sub‑roof boards, and installation of external condensation insulation. Refurbishment of skylights. Window and brickwork refurbishment. The option will be activated subject to sufficient budget availability. Phase 5 (option): Brickwork refurbishment along the boundary to Vestre Fængsel, from Enghavevej 85 to Vigers
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The construction project concerns the refurbishment of the building envelope at Hovedstadens Beredskab Teknik and will be carried out in five phases. Phases 1–3 (fixed works): Replacement of the roof covering, installation of internal insulation and external condensation insulation. Replacement of ridge lights. Refurbishment and partial replacement of facade windows. Minor brickwork repairs. Installation of photovoltaic panels. Phase 4 (option): Replacement of the roof, including sub‑roof boards, and installation of external condensation insulation. Refurbishment of skylights. Window and brickwork refurbishment. The option will be activated subject to sufficient budget availability. Phase 5 (option): Brickwork refurbishment along the boundary to Vestre Fængsel, from Enghavevej 85 to Vigers
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 286989-2026. Verificado el 21 ago. 2026 22:07.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.