Amtliche Zusammenfassung · English
Was wird beschafft?
The scope of the work is mechanical or electrical engineering work for new build, extensions, adaptations and refurbishment. The scope of work typically includes, but is not limited to, • Lot D Mechanical - replacement boiler plant and associated equipment, wiring and controls, and or replacement heating installations to existing buildings. • Lot E Electrical - rewiring of existing buildings. Other specialist installations may be considered within the particular experience and expertise of the particular partner.…
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · English
The scope of the work is mechanical or electrical engineering work for new build, extensions, adaptations and refurbishment. The scope of work typically includes, but is not limited to, • Lot D Mechanical - replacement boiler plant and associated equipment, wiring and controls, and or replacement heating installations to existing buildings. • Lot E Electrical - rewiring of existing buildings. Other specialist installations may be considered within the particular experience and expertise of the particular partner.…
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
-
Auftragsbekanntmachung Angezeigte Bekanntmachung
· Find a Tender ocds-h6vhtk-0526e6
Amtliche Bekanntmachung öffnen ↗
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
Find a Tender · ocds-h6vhtk-0526e6. Geprüft am 04.10.2026, 01:12.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.