Amtliche Zusammenfassung · English
Was wird beschafft?
The Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services should consist of suitably qualified and experienced resources including a Project Manager, Civil and Road Engineers, Quantity Surveyor, PSDP, Landscape Architect and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The team will be required for all 5 stages of the project, Initial Design, Detailed Design and Planning, Procurement of a Suitable Works Contractor, Construction and Handover.
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · English
The Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services should consist of suitably qualified and experienced resources including a Project Manager, Civil and Road Engineers, Quantity Surveyor, PSDP, Landscape Architect and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The team will be required for all 5 stages of the project, Initial Design, Detailed Design and Planning, Procurement of a Suitable Works Contractor, Construction and Handover.
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
-
Bekanntmachung vergebener Aufträge Angezeigte Bekanntmachung
· TED 656921-2026
Amtliche Bekanntmachung öffnen ↗
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
TED · 656921-2026. Geprüft am 23.09.2026, 11:05.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.