Offen Quelle · Sprache: English

Irland · Mineralölerzeugnisse, Brennstoffe, Strom und Energie

Offizieller TED-Titel · English

Supply, Installation, Testing and Commissioning of Ground Mounted Solar PV and Battery Energy Storage System Garranty, Inishturk Island, Co. Mayo

Augustine O'Toole · Irland

Frist 17.09.2026, 11:00 UTC
Geschätzter Wert40.000 EUR
Veröffentlicht31.08.2026
Amtliche Bekanntmachung öffnen ↗

Offizielle Zusammenfassung · English

Was wird beschafft?

The Contracting Authority invites suitably qualified and experienced contractors to tender for the supply, delivery, installation, testing, commissioning and handover of a ground mounted solar photovoltaic (PV) system with battery energy storage system (BESS) at Garranty, Inishturk Island, Co. Mayo. The works shall include all labour, materials, equipment, transportation, plant, ancillary components, testing, certification, commissioning and training necessary for the complete operational installation.

Bekanntmachungsverlauf

Zeitlicher Ablauf des Vergabeverfahrens

Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.

Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.

  1. Auftragsbekanntmachung Aktuelle Bekanntmachung

    · TED 596675-2026

    Amtliche Bekanntmachung öffnen ↗

Der Zeitverlauf wurde aus verknüpften amtlichen TED-Bekanntmachungen zusammengestellt. Maßgeblich sind die amtlichen Dokumente.

Quelle und Verlässlichkeit

Quelle: amtliche TED-Bekanntmachung 596675-2026, zuletzt geprüft am 03.09.2026, 10:05. Maßgeblich bleibt die Originalveröffentlichung.

Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.