Offizielle Zusammenfassung · English
Was wird beschafft?
Veas has a continual need for mechanical services, industrial plumbing and other relevant maintenance work connected to the operation and upgrading of equipment and treatment plant at Veas. Veas would like to use a new final dewatering facility at the start of 2027, and the extent of the mechanical services connected to the start-up and operation of this part of the treatment plant is uncertain. The contracting authority needs parallel framework agreements with up to 3 tenderers within mechanical maintenance and pipe work. The framework agreement period is 4 years and the estimated value is NOK 60 million. The contracting authority requires a prioritised customer and that work as needed shall start within 48 hours on weekdays. The tender deadline is shortened to 10 days by use of a prior i
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
-
Berichtigungsbekanntmachung
· TED 545723-2026
Geänderte Abschnitte: 2 Amtliche Bekanntmachung öffnen ↗ -
Berichtigungsbekanntmachung Aktuelle Bekanntmachung
· TED 595552-2026
Geänderte Abschnitte: 1 Amtliche Bekanntmachung öffnen ↗
Der Zeitverlauf wurde aus verknüpften amtlichen TED-Bekanntmachungen zusammengestellt. Maßgeblich sind die amtlichen Dokumente.
Quelle und Verlässlichkeit
Quelle: amtliche TED-Bekanntmachung 595552-2026, zuletzt geprüft am 28.08.2026, 10:05. Maßgeblich bleibt die Originalveröffentlichung.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.