Amtliche Zusammenfassung · English
Was wird beschafft?
The objective of the procurement is to engage a tenderer who will be responsible for the services that shall be provided in contract 7602 Joint infrastructure and ground work C1/B3. The assignment includes two main elements - the construction of a joint infrastructure for Nye Aker Hospital and the establishment of a construction pit for PHA north and mid. The assignment is covered by three measures that each have their own framework application to the Planning and Building Agency, which shall be carried out in parallel.
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · English
The objective of the procurement is to engage a tenderer who will be responsible for the services that shall be provided in contract 7602 Joint infrastructure and ground work C1/B3. The assignment includes two main elements - the construction of a joint infrastructure for Nye Aker Hospital and the establishment of a construction pit for PHA north and mid. The assignment is covered by three measures that each have their own framework application to the Planning and Building Agency, which shall be carried out in parallel.
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
TED · 586923-2026. Geprüft am 28.08.2026, 07:05.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.