Offizielle Zusammenfassung · English
Was wird beschafft?
The Collaboration Project Sustainable Sick Leave (BS) is a part of AID ́s work on following-up the Contract for reduced sick leave and loss from working life (the IA agreement). The collaboration project is anchored in the national budget (Chapter 601, item 75 Enclosed for effective sick leave) and annual awards from AID to the Norwegian Medical Association. The contracting authority would like, with the procurement, to implement an evaluation project that shall be both directed towards mapping the effects/results of the initiatives in the collaboration project BS, at the same time as it is relevant to map and assess the efforts and activities in the cooperation project. Reporting along the way shall contribute to adjusting the measures. The procurement is related to work with following-up
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
Der Zeitverlauf wurde aus verknüpften amtlichen TED-Bekanntmachungen zusammengestellt. Maßgeblich sind die amtlichen Dokumente.
Quelle und Verlässlichkeit
Quelle: amtliche TED-Bekanntmachung 586043-2026, zuletzt geprüft am 28.08.2026, 06:05. Maßgeblich bleibt die Originalveröffentlichung.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.