Amtliche Zusammenfassung · Nederlands
Was wird beschafft?
VITO is searching for candidates for the design, engineering (concept, basic and detail), construction, delivery, installation and commissioning (with CE-label) of a thin film evaporator. Since the thin film evaporator will be operated using (flammable) solvents, the engineering phase also includes the required safety studies, such as ATEX, HAZOP and certification.
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · Nederlands
VITO is searching for candidates for the design, engineering (concept, basic and detail), construction, delivery, installation and commissioning (with CE-label) of a thin film evaporator. Since the thin film evaporator will be operated using (flammable) solvents, the engineering phase also includes the required safety studies, such as ATEX, HAZOP and certification.
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
-
Bekanntmachung vergebener Aufträge Aktuelle Bekanntmachung
· TED 553925-2026
Amtliche Bekanntmachung öffnen ↗
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
TED · 553925-2026. Geprüft am 24.08.2026, 16:05.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.