Sammenfatning af muligheden
Hvad indkøbes?
Nygårdstunnelen in Bergen was opened in 1999 and is 864 metres long. The tunnel runs from the Puddefjord Bridge to Nygårdstangen, with exit ramps at O.J. Brochsgate. There are 2 lanes from the Puddefjord Bridge, whilst there are 1 lanes from O.J. Brochs gate. These meet in the tunnel so that there are 3 lanes at the exit and entrance at Nygårdstangen. The annual daily traffic is approx. 45,000. The tunnel shall be upgraded in accordance with the tunnel safety regulations and equipment in and outside the tunnel shall be replaced and replaced with new equipment that meets the current requirements. This includes, among other things: • New ventilation system. • New lighting installations with both new lights in the tunnel roof and continuous evacuation lights. • Extinguishing water shall be se
Kilde og pålidelighed
Kilde: officiel TED-meddelelse 566194-2026, senest kontrolleret 21. aug. 2026 21.05. Den oprindelige offentliggørelse er fortsat gældende.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.